NEW QUESTION 81 - NEW QUESTION 90:

1.|2016 Sep. NEW HP0-S42 Exam Dumps(PDF & VCE) 210Q&As Download:http://www.braindump2go.com/hp0-s42.html
2.|2016 Sep. NEW HP0-S42 Exam Questions & Answers:https://drive.google.com/folderview?id=0B75b5xYLjSSNWm5zRU9iYm8zZms&usp=sharing

QUESTION 81
SPP 2011.09.0 is running on a ProLiant server. On which day will the HP Services Pack support plan end for this version?

A.    Last day of March 2012
B.    Last day of September 2012
C.    Last day of March 2014
D.    Last day of September 2014

Answer: B
Explanation:
http://h18004.www1.hp.com/products/quickspecs/14080_div/14080_div.pdf (page 1, third paragraph, last sentence)

QUESTION 82
You are planning the new environment for a customer server consolidation project. Which tool properly sizes the hypervisor environment and creates a Bill of Materials (BOM)?

A.    HP ProLiant server sizer for ESX Server
B.    HP Insight Software Sizer
C.    HP Smart Solution Designer
D.    HP Sizer for Citrix XenDesktop

Answer: A
Explanation:
The HP Sizer for Server Virtualization is an automated, downloadable tool that provides quick and helpful sizing guidance for "best-fit" HP server and storage configurations running in VMware vSphere 5.0 or Microsoft Hyper-V R2 environments. The tool is intended to assist with the planning of virtual server deployment projects on HP server and storage technologies. It enables the user to quickly compare different solution configurations and produces a customizable server and storage solution complete with a detail Bill of Materials (BOM) that includes part numbers and prices

QUESTION 83
Which benefits does HP Matrix OE infrastructure orchestration functionality provide to customer? (Select two)

A.    A role-based deployment solution for virtual and physical environments
B.    An end-to-end systems management solution
C.    A benchmark solution for different server architectures
D.    A portal-driven migration path for existing virtual environments
E.    A template-based service portal

Answer: AE
Explanation:
http://h18004.www1.hp.com/products/servers/docs/4AA3-8517ENW.pdf (page 3, see provisioning storage for private cloud environments, third para)

QUESTION 84
What is a lightweight service that provides OS-level information to iLO?

A.    Insight Management WBEM Provider
B.    Insight Management SNMP Provider
C.    Agent Based Management Service
D.    Agentless Management Service

Answer: D
Explanation:
http://h30507.www3.hp.com/t5/Coffee-Coaching-HP-and-Microsoft/HP-ProLiant-Gen9-Agentless-Management-Overview/ba-p/108579#.U32HEJSSxUM

QUESTION 85
After booting Gen9 server into intelligent Provisioning and selecting Perform maintenance, Why is Firmware Update icon lighter than the other one the screenshot shown?
 

A.    There are no initial networking parameters
B.    The system has not completed a full POST process
C.    The user has insufficient permissions
D.    Firmware has just been updated

Answer: D
Explanation:
Normally the icons gray out when there are insufficient permissions to access it. In this case, the icon is not grayed which means that the firmware has just been updated and there are not more firmware updates to download.

QUESTION 86
What is a limitation when configuring a server hardware solution using UDIMMs?

A.    minimum amount of CPUs per channel
B.    maximum size of DIMMs per channel
C.    maximum number of DIMMs per channel
D.    minimum speed of DIMMS per channel

Answer: C

QUESTION 87
What is a typical usage of HP Matrix OE infrastructure orchestration functionality? (Select two)

A.    Automatic movement of a virtual machine to a host with less load
B.    Dynamic server migration based on load
C.    Rapid provisioning and deprovisioning of complex infrastructure designs
D.    Improved utilization of infrastructure resource through reservation and schedules
E.    Converting of an AMD virtual machine container to run on Intel

Answer: CD
Explanation:
http://h20000.www2.hp.com/bc/docs/support/SupportManual/c03132773/c03132773.pdf (page 10, see the last bulleted point on the page and the last 4th bulleted point)

QUESTION 88
A customer with a limited budget is planning to implement critical business unit. The company is projecting variable growth. The result of the system sizing, in an initial phase, is a solution containing eight servers with dual processors.
Which BladeSystem supports the customer's needs?

A.    HP c7000 enclosure with one OA, redundant Ethernet switches, and eight BL460c Gen9 servers
B.    HP c3000 enclosure with one OA, redundant Ethernet switches, and eight BL460c servers
C.    HP c7000 enclosure with one OA, redundant Ethernet switch, and fully populated with BL460c Gen9 servers
D.    HP c3000 enclosure with one OA, one Ethernet switch and fully populated with BL460c Gen9 servers

Answer: B

QUESTION 89
A customer bought 30 ProLiant DL360p Gen9 with 750 watt Platinum Power Supplies. Due to space restrictions, this configuration needs to be installed in the smallest possible footprint. The maximum estimated heatload will be 22.5KW. The data center is designated for a maximum load of 8 KW per rack.
What is the best solution?

A.    Use an HP 10642 G2 Rack with Top Exhaust Rack option
B.    Use an HP 10842 G2 Rack with Rack Root Mount Fan option
C.    Use an HP 10647 G2 Rack with Rack Airflow Optimization Kit Option
D.    Use an HP Modular Cooling System G2

Answer: A
Explanation:
The HP Modular Cooling System G2 is the next generation self-cooled rack for high density deployments in the datacenter. HP's new Bi-Directional cooling technology makes possible the simultaneous cooling of two racks with a single MCS G2 unit. The MCS G2 racks can cool up to 17.5kW per rack when cooling two racks or up to 35kW when cooling a single rack

QUESTION 90
You are planning an HP BladeSystem solution based on a c7000 enclosure. The customer has the connectivity requirement shown in the picture. Which interconnect configuration can you use to satisfy the customer's requirements?
 

A.    Virtual Connect Flex10 modules in interconnect bays 1 and 2 and virtual Connect 8 GB Fibre channel modules in bays 3 and four
B.    HP 10GbE Pass-Thru modules in interconnect bays 1 and 2 and Brocade 9 Gb switches in bays 3 and 4
C.    Virtual Connect FlexFabric modules in increment bays 1 and 2
D.    Procurve 6120/XG modules in interconnect bays 1 and 2 and Brocades 8 Gb SAN switches in bays 3 and 4

Answer: A


!!!RECOMMEND!!!

1.Braindump2go|2016 Sep. NEW HP0-S42 PDF & HP0-S42 VCE 210Q&As Download:

http://www.braindump2go.com/hp0-s42.html

2.Braindump2go|2016 Sep. NEW HP0-S42 Questions & Answers:

https://drive.google.com/folderview?id=0B75b5xYLjSSNWm5zRU9iYm8zZms&usp=sharing

Post date: 2016-09-05 01:30:13
Post date GMT: 2016-09-05 01:30:13
Post modified date: 2016-09-05 01:30:13
Post modified date GMT: 2016-09-05 01:30:13
Powered by [ Universal Post Manager ] plugin. HTML saving format developed by gVectors Team www.gVectors.com